QUEST Selection criteria for project selection include:
A cost versus benefit
B risk
C contribution towards organizational goals
D rate of return
E All of the above.
参考答案:E
QUEST The purpose of configuration management is to:
A insure drawings are updated
B control change throughout the project
C control change during the production only
D generate engineering change proposals
E inform the project manager of changes
参考答案:B
QUEST A work breakdown structure is most useful for:
A identifying individual tasks for a project
B scheduling the start of tasks
C developing a cost estimate
D determining potential delays
E A and C
参考答案:E
QUEST A Gantt chart is useful in determining:
A the level of effort for a task
B when a task starts and stops
C how tasks are related to each other
D who is assigned to do a task
E All of the above.
参考答案:B

QUEST A technical requirement has which of the following characteristics:
A easy to understand
B a communication tool between the user and the design team
C written in non-technical language
D developed in cooperation with the user
E typically describe physical dimensions and performance requirements
参考答案:E
相关试题:
2010年PMP美国项目管理考试习题及答案十一
试题推荐:
2010年PMP美国项目管理认定考试全真模拟试题精选1
2010年PMP美国项目管理认定考试全真模拟试题精选2
2010年PMP美国项目管理认定考试全真模拟试题精选3
本文内容来自自互联网公开信息或用户自发贡献,该文观点仅代表作者本人,版权归原作者所有。本站仅提供信息存储空间服务,不拥有所有权,不承担相关法律责任。若发现侵权或违规内容请联系电话4008352114或邮箱442699841@qq.com,核实后本网站将在24小时内删除侵权内容。