监理公司管理系统 | 工程企业管理系统 | OA系统 | ERP系统 | 造价咨询管理系统 | 工程设计管理系统 | 签约案例 | 购买价格 | 在线试用 | 手机APP | 产品资料
X 关闭
软件项目管理工具

当前位置:工程项目OA系统 > 建筑OA系统 > 软件项目管理工具

2010年PMP美国项目管理考试习题及答案十二

申请免费试用、咨询电话:400-8352-114

QUEST Selection criteria for project selection include: 
A cost versus benefit 
B risk 
C contribution towards organizational goals 
D rate of return 
E All of the above. 
参考答案:E

QUEST The purpose of configuration management is to: 
A insure drawings are updated 
B control change throughout the project 
C control change during the production only 
D generate engineering change proposals 
E inform the project manager of changes 
参考答案:B

QUEST A work breakdown structure is most useful for: 
A identifying individual tasks for a project 
B scheduling the start of tasks 
C developing a cost estimate 
D determining potential delays 
E A and C 
参考答案:E

QUEST A Gantt chart is useful in determining: 
A the level of effort for a task 
B when a task starts and stops 
C how tasks are related to each other 
D who is assigned to do a task 
E All of the above. 
参考答案:B

QUEST A technical requirement has which of the following characteristics: 
A easy to understand 
B a communication tool between the user and the design team 
C written in non-technical language 
D developed in cooperation with the user 
E typically describe physical dimensions and performance requirements 
参考答案:E

相关试题:

2010年PMP美国项目管理考试习题及答案十一

试题推荐:

2010年PMP美国项目管理认定考试全真模拟试题精选1

2010年PMP美国项目管理认定考试全真模拟试题精选2

2010年PMP美国项目管理认定考试全真模拟试题精选3

发布:2007-03-02 10:55    编辑:泛普软件 · xiaona    [打印此页]    [关闭]
相关文章:

泛普软件项目管理工具其他应用

项目管理工具 禅道项目管理软件 梦龙项目管理软件 微软项目管理软件 装饰管理系统 装修预算软件 项目计划软件 项目进度管理软件 软件项目管理工具 材料管理软件 工程项目管理软件系统 项目管理系统 施工管理软件 建筑工程项目管理软件 工程管理软件