QUEST Methods and techniques used to examine cost and technical data are called feasibility studies. The economic aspects of a feasibility study include interest rates, present worth factors, operating costs, depreciation and _____.
A Capitalization costs.
B Technical skill requirements.
C Technology forecasting.
D Strategic marketing intelligence.
E All of the above.
参考答案:A
QUEST Cost management includes:
A Cost estimating/forecasting.
B Cost budgeting/cost control.
C Cost applications.
D All of the above.
E A and B only.
参考答案:D
QUEST A variance envelope has been established on a project. The envelope goes from +-30% in R&D to +-5% during manufacturing. The reason for the change in thickness of the envelope is because:
A The management reserve has been used up.
B The accuracy of the estimates in manufacturing are worse than the estimates in R & D.
C Tighter controls are always needed as a project begins to wind down.
D Of the personal desires of the project sponsor.
E Of none of the above
参考答案:E
QUEST Which of the following would most likely increase the accuracy of estimating the project cost?
A Pricing out the work at lower levels in the work breakdown structure.
B Using historical data.
C Talking to people who have worked on similar projects.
D All of the above.
E A and C only.
参考答案:D

QUEST Life cycle costing is the total cost to the customer for the acquisition and ownership over its full life. Life cycle costing categories include the cost of _____, _____, and _____.
A R & D, maintainability, operation and support.
B R & D, production, operation and support.
C Acquisition, operations, maintenance.
D Production, operations, maintenance.
E None of the above
参考答案:B