PMP认证考试练习题及参考答案(十八)
1. which of the following fall(s) under the responsibilities of a project manager?
a. labor relations with project personnel
b. affirmative action
c. personnel training
d. discrimination and equal employment opportunity
e. all of the above
ans: e
2. a legally binding document offered unilaterally is a _____ .
a. purchase order
b. scope of work description
c. contract stipulation
d. level of effort proposal
e. request for proposal考试大论坛
ans: a
3. a technical requirement has which of the following characteristics:
a. easy to understand
b. a communication tool between the user and the design team
c. written in non-technical language
d. developed in cooperation with the user
e. typically describe physical dimensions and performance requirements
ans: e
4. if a project manager communicates a verbal message to a subordinate, and the subordinate leaves without saying a word, the project
manager should assume:
a. the message was understood
b. the message was not understood
c. the subordinate discarded the information
d. the information was not appropriate
e. none of the above.
ans: e
5. inspection of a complex project according to specifications is accomplished by _____.
a. inspection by attributes.
b. cyclical inspection
c. quality conformance inspection
d. original inspection来源:考试大网
e. none of the above.
ans: c
6. the behavioral responsibilities of a project manager may also include dealing with:
a. the public
b. regulatory personnel
c. the legal environment
d. environmental issues
e. all of the above
ans: e
7. the difference between the bcws and the bcwp is referred to as the:
a. schedule variance
b. cost variance.
c. estimate of completion
d. actual cost of the work performed
e. none of the above
ans: a
8. "paraphrasing" is most closely associated with which part of the communication process?
a. encoding
b. decoding
c. barriers
d. feedback
e. none of the above.
ans: d
9. a gantt chart is useful in determining:
a. the level of effort for a task
b. when a task starts and stops
c. how tasks are related to each other
d. who is assigned to do a task来源:考试大
e. all of the above.
ans: b
10. a contract originated bilaterally may be developed by _____ .
a. quotation request from suppliers
b. proposal request
c. bid invitation release
d. b and c
e. all of the above.
ans: e
11. in a matrix organizational form, which factor(s) make it difficult for a project manager to provide a valid input into the employee's performance
review?
a. not working directly with the assigned functional employees
b. employees spend only a short amount of time assigned to the project
c. not being knowledgeable enough to evaluate employees on technical judgment
d. all of the above
e. a and b only
ans: d来源:www.examda.com
12. upon completion of 75% of the project, the original schedules and cost estimates that were submitted at the inception of the project are
referred to as the:
a. baseline costs
b. budgeted costs.
c. estimates upon completion costs
d. scheduled costs
e. none of the above
ans: a
- 1建筑工程项目管理软件
- 2软件项目管理工具
- 3项目管理系统
- 4工程行业科研项目管理系统
- 5工程项目管理软件下载
- 6开源项目管理系统下载
- 7工程项目管理
- 8多项目管理
- 9项目管理
- 10哪家项目管理好
- 11企业项目管理排名
- 12项目管理系统有哪些
- 1安全工程师答疑荟萃:特种劳动防护用品
- 22015年二级建造师《法规》重点:施工许可证被废止
- 32015年招标师《专业实务》辅导:投标保证金的提交
- 42013年二级建造师《施工》重点:组织设计的基本内容
- 5一级建造师管理与实务复习要点:三同时
- 6交通繁忙地段T梁采用横移落梁架设施工
- 7二级建造师法规知识点:劳动争议的范围
- 8造价工程师考试辅导资料:岩石的主要物理性质
- 9清远市2015年造价工程师考试报名确认时间为6月12日
- 102015年咨询工程师《分析与评价》每日一练(3.2)
- 11《招标采购专业实务》考点归纳:投标资质审定
- 12上海某滨河绿地施工组织设计
- 13信息系统项目管理师通过有感
- 14搅拌车电路故障的方法解析
- 152015年安全工程师《事故案例分析》模拟题(6)
- 162015年咨询工程师《工程咨询概论》每日一练6.13
- 17检修后烘炉试车的安全注意事项
- 182012一级建造师《工程经济》:现金流量表中现金的内涵
- 192015年招标师:招标采购专业实务精选习题3
- 20化学危险物品仓库如何安全度夏
- 212015年安全工程师考试《安全生产技术》高分突破(三)
- 222015年注册安全工程师事故案例分析模拟试题(二十二)
- 232015年监理工程师考试备考5种复习技巧
- 242015年二级建造师执业资格考试备考经验
- 25景观工程施工组织设计68p
- 262015年监理工程师《建设工程三大控制》练习题(69)
- 27拉萨市城建城局公园施工组织
- 28二级建造师初始注册的相关知识及流程
- 292015年招标师《专业实务》辅导:工程建设项目的管理方式
- 302015招标师《法律法规与政策》:废标情况
成都公司:成都市成华区建设南路160号1层9号
重庆公司:重庆市江北区红旗河沟华创商务大厦18楼