监理公司管理系统 | 工程企业管理系统 | OA系统 | ERP系统 | 造价咨询管理系统 | 工程设计管理系统 | 签约案例 | 购买价格 | 在线试用 | 手机APP | 产品资料
X 关闭
软件项目管理工具

当前位置:工程项目OA系统 > 建筑OA系统 > 软件项目管理工具

PMP认证考试练习题及参考答案(四十)

申请免费试用、咨询电话:400-8352-114

1 Japanese quality control has improved dramatically in the last 30 years for all of the following reasons except:
A the use of quality circles.
B small, continuous improvements in quality control.
C the use of worker suggestion systems.
D the use of quality control charts. 来源:www.examda.com
E focusing quality control efforts on production outputs.
ans:E
2 Control chart theory is based on the differentiation of the causes of variations in quality. Variations may be produced by assignable causes. All of the following are examples of assignable causes except:
A differences among machines.
B differences among workers.
C differences among materials.
D differences in each of these factors over time.
E None of the above (all are examples)
ans:E
3 The rule of seven used by quality control engineers states that if a run of seven or more samples lays on one side of the process mean, then the process is out of control. What is the probability that this condition is the result of random variations.
A 14.30%
B 3.12%
C 2.73% www.Examda.CoM
D 1.56%
E 0.78%
ans:D
4 Two sources of variation in the length of hex bolts exist. Production variation and measurement error. The QC manager knows that the standard deviation from these sources is 0.24" and 0.43" , respectively. What is the total standard deviation.
A .10 inch.
B .19 inch.
C .34 inch.
D .49 inch.
E .67 inch.
ans:D
5 Affinity diagrams are used to:
A determine if a process is in control.
B determine root cause.
C show the relationship among variables.
D categorize large amounts of data.
E None of the above.
ans:D
6 Which quality management tool would be used to determine potential causes of a production problem?
A control chart.
B Ishikawa diagram.
C scatter diagram.
D histogram. 来源:www.examda.com
E run chart.
ans:B
7 Which of the following is not an input to quality planning?
A scope statement.
B regulations.
C work results.
D standards.
E quality policy.
ans:C
8 To determine what causes the majority of quality problems in a process, a very useful tool is the:
A cause and effect diagrams.
B flow chart.
C control chart.
D pareto chart.
E trend chart.
ans:D
9 For a given characteristic in a construction process, the standard deviation associated with production variation is 0.8", and the standard deviation associated with measurement variation is 0.6". The total standard deviation for this characteristic is:
A 1.4"
B 1.2".
C 1.0"
D 0.8"
E 0.2"
ans:C
10 Assignable cause or special variation is:
A is indicated when a point falls outside the control limits.
B is indicated when a point falls outside the specification limits.
C is indicated when a run of seven or more points fall above the center line of a standard control chart.
D is indicated when a run of seven or more points fall below the center line of a standard control chart.
E A, C, and D.
ans:E www.Examda.CoM
11 Quality control charts show a characteristic of the product or service against:
A the specification limits.
B customer requirements.
C control limits based on three standard deviations in each direction.
D control limits based on six standard deviations in each direction.
E A and D only
ans:C
12 Which of the following constitute Juran's "quality trilogy":
A planning, inspection, control.
B planning, improvement, control.
C planning, organization, control.
D product, price, customer.
E design, build, deliver.
ans:B
发布:2007-03-02 10:50    编辑:泛普软件 · xiaona    [打印此页]    [关闭]
相关文章:

泛普软件项目管理工具其他应用

项目管理工具 禅道项目管理软件 梦龙项目管理软件 微软项目管理软件 装饰管理系统 装修预算软件 项目计划软件 项目进度管理软件 软件项目管理工具 材料管理软件 工程项目管理软件系统 项目管理系统 施工管理软件 建筑工程项目管理软件 工程管理软件