QUEST The best way to insure quality conformance is to _____.
A distribute the responsibility to subordinates.
B maintain total control.
C train each worker to implement the work.
D inspect quality into the project.
E None of the above.
参考答案:C
QUEST In order to achieve long-term quality improvements, management must do the following:
A Motivate the employees with seminars, contests, and institute programs such as "Quality Improvement' day.
B Create a quality control department and give the head of the department ultimate responsibility for quality improvement.
C Implement of a formal quality control program with worker and management involvement.
D Establish financial incentive packages for worker.
E A and D
参考答案:C
QUEST The zero defects concept
A is a performance standard for management
B is a motivational technique that promotes "doing it right the first time".
C is used by management to communicate to all employees that everyone should do things right the first time.
D A and C.
E B and C
参考答案:D
QUEST An acceptance control chart has limits that are based on the spec. limits for the product rather than limits which differentiate between random and assignable causes. Under which of the following circumstances should a QC manager consider this type chart
A When the engineering tolerance on a dimension greatly exceeds the natural dispersion of the manufacturing process
B When the number of samples outside the current control chart limits become too costly and cumbersome to investigate.
C When a process is subject to constant but stable tool wear.
D A and B.
E A and C
参考答案:E
QUEST In the project environment, the individual ultimately responsible for quality control is:
A The line workers who must strive "to do things right the first time" to avoid quality problems.
B the company's quality control manager who must work with the project members to ensure the quality control program is effective.
C The head of the production department who retains ultimate quality control responsibility for all the company's projects.
D The project manager who has ultimate responsibility for the entire project.
E the customer who must ensure that he is receiving a quality product from the vendor.
参考答案:D
相关试题:
2010年PMP美国项目管理考试习题及答案六十三
试题推荐:
2010年PMP美国项目管理认定考试全真模拟试题精选1
2010年PMP美国项目管理认定考试全真模拟试题精选2
2010年PMP美国项目管理认定考试全真模拟试题精选3
- 1建筑工程项目管理软件
- 2软件项目管理工具
- 3项目管理系统
- 4工程行业科研项目管理系统
- 5工程项目管理软件下载
- 6开源项目管理系统下载
- 7工程项目管理
- 8多项目管理
- 9项目管理
- 10哪家项目管理好
- 11企业项目管理排名
- 12项目管理系统有哪些
- 1跌水设计课件
- 22015年咨询工程师《项目决策分析与评价》每日一练(11.11)
- 3施工项目竣工验收 主要内容
- 42015造价员《土建工程》造价基础知识:基坑支护工程
- 5某小区给排水工程施工方案25P
- 6施工单位进场施工工作指引流程(万科)
- 7水利水电项目的景观环境影响评价
- 82015年咨询工程师《项目决策分析与评价》每日一练2.19
- 92015招标师《法律法规与政策》:工程建设项目招标投标投诉
- 10深基坑工程施工中遇到的问题
- 11安全工程师答疑荟萃:专职安全管理人员
- 12造价工程师建设工程造价管理复习资料——方案综合评价方法
- 13某住宅楼工程施工现场平面图
- 142015年安全工程师考试《安全生产法》:行政处罚的机关
- 152015年咨询工程师《工程咨询概论》每日一练(10.8)
- 16造价工程师复习资料:民用住宅建筑设计的基本要求
- 17四川某校区景观和绿化工程施工组织设计
- 182015年监理工程师三控选择第101-110题
- 19地基处理方法之灰土挤密桩法
- 202015年咨询工程师《工程咨询概论》练习题28
- 21某四层综合楼消防系统工程施工组织设计
- 22住宅主体施工组织设计
- 232015年咨询工程师考试《项目决策分析与评价》模拟试题(10)
- 242015咨询工程师考试《项目组织与管理》模拟练习(9)
- 252012一级建造师:案例分析的公式汇总(1)
- 26二建复习资料砼垫层工程量计算方法
- 27安全工程师辅导资料:电力施工安全管理3
- 282015年无锡安全工程师报名时间为4月12日-年5月9日
- 29植物培植七百
- 30山东省潍坊市审计5年内查出违规金额31亿元
成都公司:成都市成华区建设南路160号1层9号
重庆公司:重庆市江北区红旗河沟华创商务大厦18楼